Alle informatie over de missie als pdf-bestand van NASA.
Van links naar rechts: Alvin Drew, Nicole Stott, Eric Boe, Steve Lindsey, Michael Barrett, Steve Bowen
Robonaut 2
Stream tijdens de gehele missie.NASA TV via UStreamDe missie:Flight Day 1• Launch • Payload bay door opening• Ku-band antenna deployment
• Shuttle robotic arm activation and payload bay survey
• Umbilical well and handheld external tank photo and TV downlink
Flight Day 2• Discovery’s thermal protection system survey with shuttle robotic arm/orbiter boom sensor system (OBSS) • Extravehicular mobility unit, or spacesuit, checkout
• Centerline camera installation
• Orbiter docking system ring extension
• Orbital maneuvering system pod survey
• Rendezvous tools checkout
Flight Day 3• Rendezvous with the International Space Station
• Rendezvous pitch maneuver photography of Discovery’s thermal protection system by Expedition 26 crew members Paolo Nespoli and Cady Coleman
• Docking to Harmony/pressurized mating adapter 2
• Hatch opening and welcoming
• Canadarm2 grapple of Express Logistics Carrier 4 (ELC4) cargo pallet, handoff to shuttle robotic arm, and handoff back to Canadarm2 for installation on the starboard
Flight Day 4• Cargo transfer
• OBSS handoff from Canadarm2 to shuttle robotic arm
• Spacewalk tool preparation
• Spacewalk 1 preparations by Bowen and Drew
• Spacewalk 1 procedure review
• Spacewalk 1 campout by Bowen
Flight Day 5• Spacewalk 1 by Bowen and Drew (J612 power extension cable installation from Unity to Tranquility, transfer of failed pump module from the payload attachment bracket on the mobile base system to external stowage platform 2, installation of a wedge for camera port 3 and installation of starboard crew equipment and translation aid (CETA) cart rail stubs)
Flight Day 6• Installation of the Permanent Multipurpose Module (PMM) to the nadir, or Earth-facing, port of Unity
• Focused inspection of Discovery’s thermal protection heat shield, if required
• Spacewalk 2 preparations by Bowen and Drew
• Spacewalk 2 procedure review
• Spacewalk 2 campout by Bowen and Drew in the Quest airlock
Flight Day 7• PMM ingress and internal outfitting
• Spacewalk 2 by Bowen and Drew (removal of thermal insulation from the ELC4, installation of CETA lights, troubleshooting of the port 1 truss radiator stowage beam bracket, removal and replacement of a cargo adapter plate on Columbus, installation of a pan and tilt unit on a camera on Dextre and removal of thermal covers)
Flight Day 8• Cargo transfer to station from the PMM
• Crew off duty time
Flight Day 9• Reconfiguration of spacewalk equipment
• Joint crew news conference
• Crew off-duty time
• Rendezvous tools checkout
• Farewells and hatch closure
• Centerline camera installation
Flight Day 10• Discovery’s final undocking from station and fly-around
• Final separation from the station
• OBSS late inspection of Discovery’s thermal heat shield • OBSS berth
Flight Day 11• Cabin stowage
• Flight control system checkout
• Reaction control system hot
Flight Day 12• Deorbit preparations
• Payload bay door closing
• Deorbit burn
• Discoverys final landing at KSC
De lanceringVorige delenDeel 1[ Bericht 0% gewijzigd door raistlin6 op 25-02-2011 12:06:46 ]
Shiz@autocorrectie"Als er een nieuwsicoon staat, foto-onderschrift, elk woord goed gespeld is en quotes kloppen en er staat 'Ik heb geen het is wanneer blijkt dat gisteren voor de dag dan dat kan ik weet toe maar anders ja veel', mis ik het."