Ben vandaag in Rotterdam geweest en was toch wel erg onder de indruk van het volgende vaartuig:
quote:
Semisubmersible crane and pipelaying (J-lay) DP vessel
Classification:
Lloyds Register and R.I.Na.
Compliance: NMD, HSE, USCG Rules
Dimensions:
Length: 198 m
Breadth: 87 m
Depth to main deck: 45 m
Transit draft: 10.5 m
Operational draft: 27.5 m
Dynamic positioning:
DP (AAA) Lloyds Register; IPD 3 R.I.Na.; Class 3 Norwegian Maritime Directorate notations; fully redundant.
Mooring system:
14 x 1,350 kW single drum winches, each 3,350 m x 3¾" mooring line and 40 t anchors.
Propulsion and thrusters:
4 x 4,500 kW propulsion azimuthing units, fixed pitch
2 x 5,500 kW retractable azimuthing units, fixed pitch
4 x 3,000 kW retractable azimuthing units, fixed pitch
2 x 2,500 kW bow tunnel units, fixed pitch
Power plant:
Total power plant 70,000 kW, 10,000 Volt;
12 diesel generators on heavy fuels divided
in 4 fire segregated engine rooms; classified UMS
Ballast system:
Computer controlled system with simulation capabilities comprising 4 x 6,000 t/h ballast pumps, fully redundant.
Lifting facilities main crane:
2 twin S 7000 model fully revolving bow mounted Amhoist
cranes. Main blocks tandem lift: 14,000 t
Main block single lift: 7,000 t revolving at 40 m rad./41 m
tieback 6,000 t revolving at 45 m rad./50 m tieback
Aux.1 block: 2,500 t revolving at 74 m rad.
Aux. 2 block: 900 t revolving at 115 m rad.
Lowering capability to 450 m below sea level
Whip hook: 120 t revolving at 150 m rad.
Pile driving/handling equipment availability:
2 Menck MHU 3000 hydraulic hammers.
2 Menck MHU 1700 hydraulic hammers.
2 Menck MHU 1000 hydraulic hammers.
2 Menck MHU 600 hydraulic hammers.
1 Menck MHU 220 hydraulic hammer.
1 Menck MHU 195 hydraulic hammer.
2 underwater power packs.
1 hydraulic hammer compensator.
Slim and free riding mode capability. Full spread of internal/external elevators ranging from 20" to 102" i./o. dia.
2 levelling system range 66" - 72" dia. - 900 t capacity.
J-Lay system:
Pipe diameter range from 4" to 32"
Main laying tension system 525 t with tensioners,
up to 2,000 t with friction clamps;
Laying tower angle 90º - 110º
Abandonment/Recovery system double capstan winch
with 550 t capacity (up to 2,000 t with clamps)
Number of welding stations: 1
Number of NDT and field joint stations: 1
Pipe string quadruple joint
Pipe storage capacity up to 6,000 t
Crew facilities:
405 fully AC single or double cabins up to 800 persons.
Helideck:
Suitable for two BV234 LR Chinook helicopters (one parked).
Classified helicopter refueling system.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
(foto's zijn vanmiddag door mij gemaakt)